Details of road works on A13, M25 and Dartford Crossing

A282 (M25) Dartford Thurrock Crossing: maintenanceWork to improve journeys at the Dartford Crossing continues this week.The following closures will be in place with a fully signed diversion for oversized vehicles for the northbound east tunnel closures:Wednesday 12 October (8.30pm to 5.30am) northbound east tunnelThursday 13 October (8.30pm to 5.30am) northbound east tunnelFriday 14 October (9pm to 5.30am) northbound east tunnelSaturday 15 October (8.30pm to 6am) northbound east tunnelSunday 16 October (8.30pm to 5.30am) northbound east tunnelThe QEII Bridge will have three (of four) lanes closed, overnight, between 10pm and 5.30am, from Monday 10 October for 5 nights. Work on Friday will start at 11pm.The QEII Bridge will be closed overnight, between 10pm and 5.30am, on Saturday 15 October. A clearly signed diversion will be in place via the east bore of the Dartford Tunnel, which will operate in reverse flow mode.A282 junction 1a Swanscombe, Kent: tunnel maintenanceWork to maintain safety by carrying out tunnel maintenance continues this week. The northbound entry slip road will be closed overnight, between 9pm and 5.30am, on Friday 14 October. A clearly signed diversion will be in place via the A282 southbound to junction 1b and return.Work to reduce congestion and improve safety continues this week as part of a major scheme to widen the A13 and the M25 junction 30 roundabout and slip roads. On the A13, narrow lanes and a 40mph speed limit are in place and on the M25, narrow lanes and a 50mph speed limit are in place. A free recovery service will operate 24 hours a day. There will be additional overnight lane and slip road closures as required. All closures will have a clearly signed diversion in place.A temporary road layout is in use on the northbound link road between junctions 31 and 30. The layout will remain in place 24/7 to enable the construction of a retaining wall. Drivers are advised to plan their journeys and allow additional time.The clockwise (southbound) link road from junction 30 to junction 31 will be closed overnight, between 10pm and 5.30am, from Monday 10 October for 5 nights. Work on Friday will start at 11pm. A clearly signed diversion will be in place via the A13 westbound, A1306 and M25 junction 31.The anti-clockwise carriageway between junctions 31 and 30 will be closed overnight, between 10pm and 5.30am, from Monday 10 October for 2 nights. A clearly signed diversion will be in place via the dedicated link road between junctions 31 and 30.The anti-clockwise (northbound) link road from junction 31 to junction 30 will be closed overnight, between 10pm and 5.30am, from Wednesday 12 October for 2 nights. A clearly signed diversion will be in place via the A1306 to the Wennington Interchange and A13 eastbound to M25 junction 30.M25 junction 31 Lakeside, Essex: bridge maintenanceWork to maintain safety by carrying out bridge maintenance will start this week. The clockwise entry slip road will be closed overnight, between 10pm and 5.30am on Saturday 15 October. A clearly signed diversion will be in place via junction 30 and return.

Leave a Reply

Your email address will not be published.