Dartford Crossing MarchA13 (A1012), Essex: resurfacing

Work to improve journeys by carrying out resurfacing will start this week. The eastbound entry slip road will be closed overnight, between 10pm and 5am, on Thursday 2 March. A clearly signed diversion will be in place via M25 junction 30 and return.

The westbound exit and entry slip roads will be closed overnight, between 11pm and 6am, on Friday 3 March. A clearly signed diversion will be in place for the exit slip road via M25 junction 30 and return. A clearly signed diversion will be in place for the entry slip road via the A128 and return.

A282 (M25) Dartford – Thurrock Crossing: maintenance

Work to improve journeys at the Dartford Crossing continues this week. The following closures will be in place with fully signed diversions in place during the northbound east tunnel closures for oversized vehicles.

During the closure of the QEII Bridge, southbound traffic will be diverted via the east tunnel which will operate in reverse flow mode.

Monday 27 February (9pm to 5.30am) northbound east tunnel
Tuesday 28 February (9pm to 5.30am) northbound east tunnel
Wednesday 1 March (9pm to 5.30am) northbound east tunnel
Thursday 2 March (9pm to 5.30am) northbound east tunnel
Friday 3 March (9pm to 5.30am) northbound east tunnel
Saturday 4 March (9pm to 5.30am) northbound east tunnel
Saturday 4 March (10pm to 5.30am) southbound QEII Bridge
Sunday 5 March (9pm to 5.30am) northbound east tunnel
The QEII Bridge will have three (of four) lanes closed overnight, between 10pm and 5.30am, on Sunday 5 March.

M25 junctions 31 Lakeside to 30 Thurrock, Essex: electrical maintenance

Work to maintain safety by carrying out electrical maintenance will start this week. The anti-clockwise carriageway between junctions 31 and 30 will be closed overnight, between 10pm and 5.30am, on Monday 27 February, and from Thursday 2 March for 2 nights. Work on Friday will start at 11pm. A clearly signed diversion will be in place via the dedicated link road between junctions 31 and 30.

M25 junctions 30 Lakeside to 31 Thurrock, Essex: electrical maintenance

Work to maintain safety by carrying out electrical maintenance will start this week. The clockwise carriageway between junctions 30 and 31 will be closed overnight, between 10pm and 5.30am, on Tuesday 28 February, and between 11pm and 5.30am on Friday 3 March. A clearly signed diversion will be in place via the dedicated link road between junctions 30 and 31.

M25 junction 30 Thurrock, Essex: electrical maintenance

Work to maintain safety by carrying out electrical maintenance will start this week. The anti-clockwise entry slip road will be closed overnight, between 10pm and 5.30am, on Wednesday 1 March. A clearly signed diversion will be in place via the A13 eastbound to the A128, A127 and M25 junction 29.

M25 junction 31 Lakeside, Essex: lighting replacement

Work to maintain safety by carrying out lighting replacement continues this week. The clockwise entry slip road will be closed overnight, between 10pm and 5.30am, on Saturday 4 March. A clearly signed diversion will be in place via junction 30 and return.