Planned roadworks for Thurrock: Mon June 12th to Sunday June 18th

M25 junction 31 Lakeside, Essex: bridge maintenance

Work to maintain safety by carrying out bridge maintenance starts this week. The clockwise exit slip road will be closed overnight, between 10pm and 5.00am, on Saturday 17 June. A clearly signed diversion will be in place via junction 30.

A13 Lakeside (A126), Essex: electrical

Work to maintain safety by carrying out electrical work will start this week. The eastbound exit slip road will be closed overnight, between 10pm and 5am, from Tuesday 13 June for three nights. A clearly signed diversion will be in place via the A1012 (Grays) junction and return.

A13 (M25), Essex: electrical

Work to maintain safety by carrying out electrical work will start this week. The westbound entry slip road will be closed overnight, between 10pm and 5am, on Monday 12 June. A clearly signed diversion will be in place via the A13 eastbound to the A1012 (Grays) junction and return.

A282 (M25) Dartford – Thurrock Crossing: routine maintenance

Work to maintain safety by carrying out routine maintenance at the Dartford Crossing continues this week. The following closures will be in place overnight, between 9pm and 5.30am, with fully signed diversions in place during the northbound east tunnel closures for oversized vehicles:

Monday 12 June: northbound east tunnel
Tuesday 13 June: northbound east tunnel
Wednesday 14 June: northbound east tunnel
Thursday 15 June: northbound east tunnel
Friday 16 June: northbound east tunnel
Saturday 17 June: northbound east tunnel
Sunday 18 June: northbound east tunnel

A282 QEII Bridge

The QEII Bridge will be closed overnight, between 10pm and 6am, on Saturday 17 June. Southbound traffic will be diverted through the east tunnel.

Leave a Reply

Your email address will not be published.