Roadworks in Thurrock: Monday July 10th to Sunday July 17th

Dartford March 2

M25 junction 31 Lakeside, Essex: Inspections

Work to maintain safety by carrying out inspection surveys will continue this week. The clockwise entry slip road will be closed overnight, between 10pm and 5.30am, from Monday 10 July for 5 nights. A clearly signed diversion will be in place via junction 30 and return.

A13 Tilbury, Essex: resurfacing

Work to improve journeys by carrying out resurfacing will continue this week. The A13 westbound and eastbound link roads to the A1089 southbound will be closed overnight, between 10pm and 5.30am, on Monday 10 July. A clearly signed diversion will be in place via the A13 to the A128 (Brentwood) junction, Brentwood Road southbound, Linford Road, Turnpike Lane and Fort Road to the A1089 St Andrews Road.

A13 (M25 junction 30), Essex: resurfacing

Work to improve journeys by carrying out resurfacing will start this week. The westbound entry slip road will be closed overnight, between 10pm and 5am, on Tuesday 11 July. A clearly signed diversion will be in place via the A13 eastbound to the A1012 (Grays) junction and return.

A282 junction 1a (M25) Swanscombe, Kent: tunnel maintenance

Work to maintain journeys by carrying out tunnel maintenance continues this week. The northbound entry slip road will be closed overnight, between 9pm and 5:30am, on Saturday 15 July. A clearly signed diversion will be in place via the A282 southbound to junction 1b and return.

A282 (M25) Dartford – Thurrock Crossing: routine maintenance

Work to maintain safety by carrying out routine maintenance at the Dartford Crossing continues this week. The following closures will be in place overnight, between 9pm and 5.30am, with fully signed diversions in place during the northbound east tunnel closures for oversized vehicles:

Saturday 15 July: northbound west tunnel
Sunday 16 July: northbound east tunnel

A282 QEII Bridge

The QEII Bridge will have 3 lanes closed overnight, between 10pm and 5.30am, from Monday 10 July for 5 nights for inspection surveys to be carried out.

A1089 Tilbury, Essex: resurfacing

Work to improve journeys by carrying out resurfacing will continue this week. The southbound carriageway will be closed overnight, between 10pm and 5.30am, on Monday 10 July. A clearly signed diversion will be in place via the A13 to the A128 (Brentwood) junction, Brentwood Road southbound, Linford Road, Turnpike Lane and Fort Road to the A1089 St Andrews Road.

The northbound carriageway will be closed overnight, between 10pm and 5.30am, from Tuesday 11 July for 4 nights. Work on Friday will start at 11pm. A clearly signed diversion will be in place via A1089 St Andrews Road, Fort Road, Turnpike Lane, Linford Road, Brentwood Road northbound (A128) to the A13 junction.

Leave a Reply

Your email address will not be published.