Roadworks in Thurrock: Monday Dec 18th to Sunday Dec 24th

A13 Thurrock, Essex: horticulture

Work to improve journeys by carrying out horticulture work will start this week. The eastbound exit slip road to the A126 will be closed overnight, between 10pm and 5am, on Monday 18 December. A clearly signed diversion for will be in place via the North Stifford junction, A1012 and B186.

The westbound entry slip road from the A126 will be closed overnight between 10pm and 5am, from Tuesday 19 December for two nights. A clearly signed diversion will be in place via the A126 southbound, B186 and A1306 to the M25 junction 31.

A13 Wennington, Essex: horticulture

Work to improve journeys by carrying out horticulture work will start this week. The westbound exit slip road will be closed overnight, between 11pm and 5am, on Thursday 21 December. A clearly signed diversion will be in place via the Ferry Lane roundabout and return.

A282 (M25) Dartford – Thurrock Crossing: routine maintenance

Work to maintain safety by carrying out routine maintenance at the Dartford Crossing continues this week. The following closures will be in place overnight, between 8.30pm and 5.30am, with fully signed diversions in place during the northbound east tunnel closures for oversized vehicles:
Monday 18 December: northbound east tunnel
Tuesday 19 December: northbound east tunnel
Wednesday 20 December: northbound east tunnel
Thursday 21 December: northbound east tunnel

A282 junction 1b Dartford, Kent: resurfacing

Work to improve journeys by carrying out resurfacing will start this week. The southbound link road to the M25 junction 2 will be closed overnight, between 10pm and 5.30am, from Monday 18 December for three nights. A clearly signed diversion will be in place via the A296 to the Bean Interchange and A2.

A1089 Tilbury, Essex: carriageway sweeping

Work to improve journeys by carrying out carriageway sweeping will start this week. The northbound link road to the A13 westbound will be closed overnight, between 11pm and 5am, on Tuesday 19 December. A clearly signed diversion will be in place via the A13 eastbound to the Orsett C (A128) roundabout and return.

Leave a Reply

Your email address will not be published.