Dartford Crossing to be closed overnight on Friday and Saturday

DRIVERS are advised that the QEII Bridge will be closed overnight this Friday and Saturday (18 and 19 March) while vital routine maintenance work is carried out.

The closures will be in place to allow bridge bearings – essential bridge components that allow the structure to expand and contract with changes in temperature – to be replaced. The work will provide drivers with safe and reliable journeys.

The work had been planned for last weekend but couldn’t be completed due to unforeseen circumstances.

The work will be carried out overnight, when traffic flows are lowest, to minimise disruption. The closures will be in place between 11pm and 6am on Friday night and between 10pm and 6am on Saturday night. Traffic will be stopped briefly while the contraflow is setup and removed.

Southbound traffic will be diverted to use the East tunnel. As a result, a height restriction of 4.8 metres will be in place for northbound traffic during the closures.

The southbound entry slip road at junction 31 will be closed due to the contraflow being in place. A diversion will be in place via junction 30.

Drivers are advised to plan their journeys and allow extra time. Live traffic information is available from Highways England via it’s website at www.highways.gov.uk/traffic-information/

Traffic alert

M25 Clockwise QE2 Bridge 3 lanes closed due to roadworks during the night Down to a single lane Between 22:00 & 5:30 16th to 18th March RT

M25 Clockwise At J30 A13 (Lakeside / Tilbury) Main carriageway closed Between 22:00 and 5:30 from 22:00 on the 16th & 17th March

Leave a Reply

Your email address will not be published.